Fully equipped with a crane line, upend line and stacked line, 3 monopiles (MPs) were transported per trip, which lead to August seeing the successful installation of the first monopiles at the Dogger Bank A wind farm.
Visit here for an insight into how we prepare bespoke solutions to your offshore wind installation challenges.