News

Seafastening Spread Re-design and Retrofit for Dogger Bank A

  • 10 February 2023
  • News

To facilitate the installation of monopiles as part of the Dogger Bank A Offshore Wind Farm, TWD aided DEME Group in the re-design and retrofit of a seafastening spread on the jack-up vessel Innovation.

Fully equipped with a crane line, upend line and stacked line, 3 monopiles (MPs) were transported per trip, which lead to August seeing the successful installation of the first monopiles at the Dogger Bank A wind farm.

Visit here for an insight into how we prepare bespoke solutions to your offshore wind installation challenges.

Share this article on