Cable Laying Equipment – Stemat Spirit

Designs allowing maximum deck utilization

For the installation of the infield cables at the Butendiek OWF, VBMS wanted to outfit the Stemat-Spirit vessel. They sought out TWD for assistance in finding a way to fit all the necessary project equipment on the Setmat-Spirit.

We designed a twin deck to accommodate cable armor installation and enable maximum deck utilization. A chute, together with secondary rollerways, was designed tailored to the project cable requirements. In addition, a partition ring was fitted to the carousel to accommodate maximum cable storage. TWD also developed the seafastening of all the remaining equipment, such as a remotely operated vehicle (ROV) launch and a recovery system.

Project highlights

  • First cable laying related scope of this magnitude for TWD
  • Our designs enable maximum deck utilization and allow a complex cable laying operation
  • VBMS was able to lay all in-field cables using the Stemat-Spirit

As the global wind energy sector expands, a shortage of vessels for handling bigger monopiles is foreseen. Simply scaling up isn’t enough. Download our Whitepaper to explore how TWD tackles supply chain bottlenecks with innovative installation methods, or get our Offshore Wind Track Record to see how we have helped industry leaders succeed in their installations.