Who are we

Temporary works design

We are specialized in creating custom-designed tools and structures that allow you to perform installation projects safely and on time. You can regard TWD as your problem solver. The reliable partner that provides cost-effective and suitable solutions, no matter how simple or complex the challenge is. Selecting TWD as your partner will complement your project team's capabilities and facilitate successful project executions.

Read more
Downloads

News

Halogaland bridge mooring analysis

October 18, 2017

Sichuan Road & Bridge Group (SRGBG) successfully installed the deck segments of the Hålogaland Bridge, the second longest suspension bridge in Norway. The deck segments were installed by the Heavy Lift Vessel Uglen. TWD played an instrumental role in determining the concept and detailed design of the mooring arrangement of both the Transport Vessel Korean Express and Heavy Lift Vessel.

News

INNOVATIVE EXCHANGE OF WTG COMPONENTS

October 6, 2017

By replacing the jack-up vessel with a floating solution with similar workability, significant costs and time can be saved. With the design of a dedicated turbine maintenance system, TWD together with Royal Wagenborg have come up with an innovative floating removal and installation method.

Video

Motion compensated pile drilling

Top