Piling Template – Aqaba Container Terminal

Smart piling frame design for combi-wall modules

BAM International constructed quay walls for a new container terminal in Aqaba, Jordan. For this construction, rows of piles needed to be driven into the seabed to build the combi-wall. To accomplish this, TWD designed a piling frame to construct the combi-wall modules.

The template was lifted with a crane on two supporting piles allowing for five piles to be installed in one cycle. In addition, to achieve a swift and accurate positioning of the template, we incorporated a hydraulic correction mechanism. Thanks to its functionalities, our piling frame design led to a fast and successful piling operation.

Project highlights

  • Five piles could be pitched simultaneously
  • Stiff frame assured pile verticality

Constructing something in the marine civil environment? Our fit-for-purpose temporary works help you overcome complex challenges. If you want to better understand the extent of TWD’s expertise, please read our Marine Civil Solutions Overview. In order to explore how we’ve contributed to industry-leading success in projects, featuring clients like VolkerStevin UK, BAM, SRGB, and more, you can download our Track Record.