Foundation Installation Equipment – Luchterduinen

Tailored design of a monopile gripper on Aeolus

To install the Luchterduinen offshore wind farm, Van Oord had to transport and install 43 monopiles using their Aeolus vessel. To assist Van Oord with this project, TWD designed a tailored monopile gripper. Our teams made sure the gripper was versatile and could be used to install monopiles with a diameter of 6-8m. Additionally, deck interfaces were integrated in the vessel, resulting in an optimal gripper stiffness.

TWD was happy to see our design of the gripper contribute to the successful installation of the Luchterduinen OWF (129 MW), which annually provides 150.000 houses with green electricity.

 

Project highlights

  • The gripper was designed to be used on multiple projects
  • Flexible design to accommodate monopiles of different sizes

Foundation Installation Equipment – Luchterduinen

You are only ONE step away from the download. Let us know a bit about you and enjoy reading!