Smart lifting tool design to cut installation time
For the construction of the Amalia viaduct at the Port of Rotterdam, TWD provided Boskalis with lifting frames. The frames enabled the swift installation of a wide range of pre-cast concrete elements of the viaduct sound barrier.
The frames ensured the pre-cast elements could be safely upended, positioned, and installed. We designed the frame with a smart adjustment mechanism that could easily correct the difference in center of gravity for various elements. Thanks to this ingenious mechanism, we achieved a safe operation significantly speeding up the time of the installation.
Project highlights
Constructing something in the marine civil environment? Our fit-for-purpose temporary works help you overcome complex challenges. If you want to better understand the extent of TWD’s expertise, please read our Marine Civil Solutions Overview. In order to explore how we’ve contributed to industry-leading success in projects, featuring clients like VolkerStevin UK, BAM, SRGB, and more, you can download our Track Record.