TWD closely collaborated with DEME Group to transport and install wind turbine generator components for the Triton Knoll OWF in the UK.
We designed a wide range of seafastening equipment, including a cantilevered blade support structure. The blade seafastening optimized Wind Osprey’s deck layout, enabling 5 turbines to be loaded on the vessel per trip.
We congratulate DEME Group on their successful installation of the final Triton Knoll turbine on 17 September!
Share this article on