Offshore wind quay on a pile grid
To provide marshalling space for the Neart Na Gaoeithe offshore wind farm, GRAHAM Civil Engineering built a 171-meter extension of the Caledon East Wharf at the Port of Dundee. The new wharf helps increase the offshore wind capacity of Scotland.
TWD developed the installation method of the 126-pile grid and a self-supporting piling gate. Two gates were fabricated to further speed the piling campaign. The double-level gate was positioned against the previously installed pile and was repositioned in a single crane lift which sped up the piling rate.
Our close collaboration with GRAHAM Civil Engineering resulted in a smart construction project.
Project highlights
Constructing something in the marine civil environment? Our fit-for-purpose temporary works help you overcome complex challenges. If you want to better understand the extent of TWD’s expertise, please read our Marine Civil Solutions Overview. In order to explore how we’ve contributed to industry-leading success in projects, featuring clients like VolkerStevin UK, BAM, SRGB, and more, you can download our Track Record.