For a challenging subsea installation of 5.000t concrete structures as part of a cooling water inlet, TWD supported the marine contractor with the design of 6 unique guiding and lifting frames. These frames enable two floating cranes to accurately position the concrete structures on the seabed.
TWD’s scope included the structural and mechanical design, as well as engineering support during the fabrication of the frames.
Project highlights
Constructing something in the marine civil environment? Our fit-for-purpose temporary works help you overcome complex challenges. If you want to better understand the extent of TWD’s expertise, please read our Marine Civil Solutions Overview. In order to explore how we’ve contributed to industry-leading success in projects, featuring clients like VolkerStevin UK, BAM, SRGB, and more, you can download our Track Record.