Quays, breakwaters & port development – Overseas AST
TWD provided a dewatering design for the Al Bateen Marina development in Abu Dhabi. The new quay wall for the marina was constructed in the dry, therefore the entire site had to be closed off and dewatered. To dewater the incoming water flow from groundwater and seaside, we designed several cofferdams, trenches, bund walls, and sheet pile structures.
In addition, TWD also delivered the designs and calculations for the reusable block wall formwork (consisting of 2,000 precast concrete blocks) as well as for lifting beams. To cast the precast blocks, we developed an adjustable steel shutter that accommodated the curved shape of the overall quay wall. TWD’s designs led to safe and efficient dewatering of the marina.
Project highlights
Constructing something in the marine civil environment? Our fit-for-purpose temporary works help you overcome complex challenges. If you want to better understand the extent of TWD’s expertise, please read our Marine Civil Solutions Overview. In order to explore how we’ve contributed to industry-leading success in projects, featuring clients like VolkerStevin UK, BAM, SRGB, and more, you can download our Track Record.