Cable laying operation accomplished within a short time frame
In 2020, TWD helped Van Oord with the landfall of an offshore export cable from the Hollandse Kust (zuid) windfarm. The landfall required the export cable to be pulled in through a pre-laid horizontal directional drilled (HDD) duct in the coastal sea defence. In a quick response, our team designed an efficient structural design of a cantilevered platform off the stern of the MPI Resolution and a combined duct hang-off and lifting tool. In addition, we performed structural integrity analysis to reuse existing equipment as well as designed support structures for the chute and quadrant on the platform.
By closely collaborating with Van Oord, we quickly conceptualized new operational methodologies and mission equipment. These were then delivered very rapidly in detailed design to meet the stringent operational timelines.
Project highlights
As the global wind energy sector expands, a shortage of vessels for handling bigger monopiles is foreseen. Simply scaling up isn’t enough. Download our Whitepaper to explore how TWD tackles supply chain bottlenecks with innovative installation methods, or get our Offshore Wind Track Record to see how we have helped industry leaders succeed in their installations.