WTG seafastening designs completed in record time
For the Rentel OWF (309MW), TWD designed tower grillages, blade racks, nacelles, and blade yoke seafastening structures on the Sea Installer vessel. We reused an existing tower adapter to reduce the fabrication time of the tower grillage significantly. As our previous designs for Sea Challenger and Apollo couldn’t be used because of vessel damages, we designed the new structures in record time to meet the tight deadlines.
Our flexibility and dedication to completing the seafastening in time led to the whole project being designed, approved, built, and fitted in 11 weeks. TWD is proud to have contributed to a wind farm that annually provides 300.000 homes with green energy.
Project highlights
As the global wind energy sector expands, a shortage of vessels for handling bigger monopiles is foreseen. Simply scaling up isn’t enough. Download our Whitepaper to explore how TWD tackles supply chain bottlenecks with innovative installation methods, or get our Offshore Wind Track Record to see how we have helped industry leaders succeed in their installations.