A smart solution designed and built to create a levelled gravel layer for caisson foundations
The Montserrat Port Development project aims to replace the existing berthing jetty to accommodate larger ships. Meridian Construction was awarded the contract to build the new jetty, with TWD assisting in engineering, procurement, and construction management (EPC), as well as overseeing the containerized transport of the Stone Spreader.
TWD’s smart solution for this project involved designing and constructing a Stone Spreader for placing a levelled gravel layer for caisson foundations. The Stone Spreader is self-leveling and features a chain-driven bucket mechanism. Additionally, TWD designed a survey tower to ensure that the caissons are correctly leveled during installation.
Throughout the project, we provided comprehensive support to Meridian Construction. TWD managed every aspect from the initial design phase to the procurement of parts and the final transportation to Montserrat.
TWD service highlights
Constructing something in the marine civil environment? Our fit-for-purpose temporary works help you overcome complex challenges. If you want to better understand the extent of TWD’s expertise, please read our Marine Civil Solutions Overview. In order to explore how we’ve contributed to industry-leading success in projects, featuring clients like VolkerStevin UK, BAM, SRGB, and more, you can download our Track Record.