Pin pile seafastening, upending hinge and internal lifting tool (ILT) installation frame
TWD helped EOS with the design of seafastenings for pin piles up to 82m long to be transported on two different barges. TWD also designed an ILT installation frame and an upending hinge which is integrated into the seafastening structure. The design process for each item included stability analysis, motion analysis and structural detailed design. Furthermore, integrity checks of the barges and cargo during sea transport and upending were carried out.
Project highlights
As the global wind energy sector expands, a shortage of vessels for handling bigger monopiles is foreseen. Simply scaling up isn’t enough. Download our Whitepaper to explore how TWD tackles supply chain bottlenecks with innovative installation methods, or get our Offshore Wind Track Record to see how we have helped industry leaders succeed in their installations.