Sapura Energy commissioned TWD to design an upend hinge, assisting monopile installation at Yunlin Offshore Wind Farm off the west coast of Taiwan. In this project, the upend hinge and the crane are not located on the same vessel. This results in relative motion between the crane vessel and the barge with the upend hinge.
Our mechanical team delivered a robust and lean design of the upend hinge that follows the motion of the monopile during the operation. The hinge can adapt to different water depths and monopile lengths, by retracting and extending the bottom beam.
Project highlights
As the global wind energy sector expands, a shortage of vessels for handling bigger monopiles is foreseen. Simply scaling up isn’t enough. Download our Whitepaper to explore how TWD tackles supply chain bottlenecks with innovative installation methods, or get our Offshore Wind Track Record to see how we have helped industry leaders succeed in their installations.