News

TWD’s Secondary Steel Installation Tool Contributing to HKZ OWF

  • 06 July 2021
  • News

Last night’s NOS Journaal featured a report about the installation kick-off of the Hollandse Kust Zuid [HKZ] OWF. The HKZ OWF is the second biggest OWF installed along the Dutch coast, and the current installation project, executed by Vattenfall, is the first time that it is done subsidy-free.

TWD is very proud to have contributed to this project with 2 smart and cost-effective equipment designs: the secondary steel installation tool and the storage towers.

Are you in need of a cost-effective Secondary Steel Installation Tool? Check out this project case about SSIT design and get an idea of how we can help you.

Share this article on