News

TWD assisted with engineering and design of a pedestal grillage for vessel JB 117

  • 10 January 2022
  • News

TWD has successfully assisted Jack-Up Barge BV with engineering and design of crane pedestal grillage for the vessel JB 117.

Our team has conducted a wide range of analyses including critical structure fatigue analysis and stability analysis of underdeck structure to ensure safe operations of the crane. Based on the result of the analysis, we have delivered an ingenious design of grillage that allows relocation of crane pedestal on deck.

We would like to give our best wishes to JB 117 and the crew. Good luck in Senegal.

Share this article on