Transporting WTG components can bring complex logistics. In Vietnam, TWD assisted DHL Global Forwarding with the loading operation of 98t tower sections. Our structural engineers designed a lifting tool with adjustable sling attachment locations. Due to our simple and flexible design approach, the lifting tool can easily be fabricated and also modified in the future to fit longer tower sections.

Although the project had tight deadlines, we managed to deliver a complete design package, including fabrication drawings, in 2 weeks.

Keen to learn more about our lifting tools? Read more about our expertise and get in touch today!

Thijs Roethof

THIJS ROETHOF
SALES MANAGER
+31 (0)10 2940 374
TROETHOF@TWD.NL


#Heavy Lifting, Mobilization, Transport, Method Engineering Greece, WTG components, DHL, DHL Global Forwarding, Vietnam

 

Top