SMIT Engineering requested TWD to design a working platform for the decommissioning of the Q8-A satellite platform. This included the foundation for a hydraulic crane, internal cutting tool, swiveling winch, and storage container. The working platform was lifted, transported to site, and installed on the jacket bracings of the Q8-A platform by the Taklift 7 crane. After works on the jacket were completed, the working platform was lifted by the Taklift and removed together with the attached jacket structure.