Scaldis Topside Decommissioning

Seafastening for topside and conductor pipes

TWD assisted Scaldis Salvage and Marine Contractors NV with decommissioning at the Camelot field. We delivered seafastening designs for the decommissioned topside as well as the conductor pipes on the Osprey Trader barge. On top of this, we conducted lifting point verification for the jacket removal. We have also provided simple load spreading using crane mats. This allowed for a simple and cheap mobilization.

 

Project highlights

  • TWD performed motion analysis and provided the accelerations as input for the seafastening design of the topside
  • Cost-effective and efficient mobilization

Scaldis Topside Decommissioning