Design of piling templates, barge stabilisation and causeway stability analyses
TWD supported Clough BMD Joint Venture with the design of several marine construction elements for the ship lift, as part of the Northern Marine Complex in Darwin, Australia. The ship lift is being delivered by Clough BMD JV in collaboration with the Northern Territory Government.
With construction of the NMC continuing to progress on site, TWD’s design solutions have helped support safe and efficient execution in challenging marine conditions. Our solutions were developed to:
Our scope included detailed spud pile penetration and stability analyses, as well as slope stability assessments of the temporary causeway, ensuring structural integrity throughout the installation process. Through close collaboration with the project team, we integrated construction sequencing and equipment access requirements directly into the design, optimising both efficiency and constructability.
This project demonstrates TWD’s ability to deliver integrated marine engineering solutions that support complex marine construction works and contribute to the successful delivery of large-scale maritime infrastructure projects.
Project highlights