Marine Construction Solutions for the Northern Marine Complex

Design of piling templates, barge stabilisation and causeway stability analyses

TWD supported Clough BMD Joint Venture with the design of several marine construction elements for the ship lift, as part of the Northern Marine Complex in Darwin, Australia. The ship lift is being delivered by Clough BMD JV in collaboration with the Northern Territory Government.

With construction of the NMC continuing to progress on site, TWD’s design solutions have helped support safe and efficient execution in challenging marine conditions. Our solutions were developed to:

  • enable precise installation of circular cofferdam structures through specialised piling templates
  • support construction of arc wall templates with integrated access considerations
  • facilitate safe transport and positioning of barges, including mooring and stabilisation analysis
  • design a temporary material offloading platform to support reclamation works using some dredged material.

Our scope included detailed spud pile penetration and stability analyses, as well as slope stability assessments of the temporary causeway, ensuring structural integrity throughout the installation process. Through close collaboration with the project team, we integrated construction sequencing and equipment access requirements directly into the design, optimising both efficiency and constructability.

This project demonstrates TWD’s ability to deliver integrated marine engineering solutions that support complex marine construction works and contribute to the successful delivery of large-scale maritime infrastructure projects.

Project highlights

  • Specialised piling templates for circular cofferdam construction
  • Comprehensive barge stabilisation and mooring analyses
  • Integrated construction sequencing and equipment access design