As part of the Killybegs Harbour expansion, ABCO Marine is extending the Smooth Point Pier. The extension is expected to boost the local economy and further position Ireland as a central hub for marine activities. It will foster sustainable growth of the fishing industry by reducing congestion at peak times.

ABCO Marine deployed their jack-up barge with two piling gates designed by TWD. The method TWD developed with ABCO installs alternate tubular piles to streamline drilling and grouting works.

Take a look at our Heavy Civils Works page to learn more about how TWD can assist in your next project.

Marine Piling Track Record


#Method Engineering, Equipment Design, Marine Engineering, Heavy Civils, Marine Piling

Top