Your Foundation Installation Specialists
With our extensive experience, our multidisciplinary team can help you successfully overcome your offshore wind challenges.
As an industry leader in the design of tailored transport and installation equipment, and with over 100 offshore wind projects under our belt, we are strongly positioned in this rapidly growing market to assist you with your next installation project.
Why Collaborate with TWD?
Our logical deck layouts, robust handling tools, and efficient installation procedures will streamline your installations and help to ensure hassle-free operations.
Our Specialties
Discover our extensive Track Record in Offshore Wind
Our offshore wind track record highlights TWD’s contribution to the successful installation of each campaign. Working closely with our clients and fabricators, we deliver a robust tool for the specific needs of each project.

Our Tools
Grippers
TWD’s tailored Grippers range from lean, project-specific tools to versatile ‘future-proof’ designs. We have the extensive experience required to successfully deliver a bespoke gripper solution to suit your project needs. Vessels fitted with our Gripper solutions:
- Svanen
- Innovation
- Bilfinger
- Aeolus
Download our Track Record for a full overview of our Gripper solutions.


Seafastening
Our safe and functional seafastening solutions range from a simple bolted connection, to a fast and modular hydraulically actuated clamping mechanism. TWD’s seafastening designs aided the transport and installation of wind farms such as Triton Knoll, Changhua, Borkum Riffgrund II, Nobelwind, and Sandbank. Our seafastening range includes:
- Cantilevered Blade Substructures
- Jackets
- Skidding
- Towers

Templates
TWD designs bespoke templates that simplify pile installation. The design of each template is not only influenced by the piling methods, but also the environmental and soil conditions, as well as any client-specific requests. We have provided templates for offshore wind projects such as St. Brieuc, Baltic II, Borkum West II, and St. Nazaire, to name a few. Possible template specialisation and attributes include:
- Pre piling
- Drilling
- Pin pile
- Offshore substation (OSS) template
- Self-leveling
Upending
Monopile upending designs vary based on the methodology and monopile size. The upend cradle or bucket defines a rotation point, such that controlled and stable upending by a crane can always be assured. A sample of projects and windfarms we have designed upending solutions for include St. Brieuc, Yunlin, Changhua, and Borkum Riffgrund II. We can help you with:
- Fixed bottom beam structures
- Extendable bottom beams
Your Installation Journey Starts Here
Let TWD do the heavy lifting.
Enquire within for a solution-centred approach to your latest challenge.
Because of this fast-paced environment and the opportunities, I had a steep learning curve in which I developed myself greatly. The beauty of TWD is that if you take initiative you can grow along with this fast-growing company. Anything is possible.
Chris Heuberger
CEO e.g.

What I like most about working at TWD is the “hands-on” mentality, the alternation between short and longer projects, the steep learning curve, and working with so many different nationalities.
Jos van Dam
Engineering Manager

Let's start your next
offshore wind project together!
Curious about how we can help you with your next project?
Reach out to Wesley de Groot and get started!
