Last week the Cantilever Bridge, constructed by BAM Clough JV, was successfully launched. After the first successful Cantilever Bridge in Papua New Guinea (PNG) in 2010, where TWD delivered the design of the Cantilever Bridge and Finishing Bridge, we are very excited to see the successful first step of the Ichthys Cantilever Bridge. Fundemental parts of the CLB in Papua New Guinea were reused and modified for this new project, located in the Ichthys field in Western Australia. TWD has assisted by calculating for the new loads, redesigning for required modifications, and designing a variety of secondary structures. It is a rewarding experience to see the CLB move forward 24 meters to its first production bent. A sound design and solid construction has resulted in one very satisfied client.

Top