News

Triton Knoll WTG components transportation and installation

TWD closely collaborated with DEME Group to transport and install wind turbine generator components for the Triton Knoll OWF in the UK.

We designed a wide range of seafastening equipment, including a cantilevered blade support structure. The blade seafastening optimized Wind Osprey’s deck layout, enabling 5 turbines to be loaded on the vessel per trip.

We congratulate DEME Group on their successful installation of the final Triton Knoll turbine on 17 September!

Tags: seafastening, tritonknoll

Share this article on

Share on linkedin
Share on facebook