Our team has conducted a wide range of analyses including critical structure fatigue analysis and stability analysis of underdeck structure to ensure safe operations of the crane. Based on the result of the analysis, we have delivered an ingenious design of grillage that allows relocation of crane pedestal on deck.
We would like to give our best wishes to JB 117 and the crew. Good luck in Senegal.